|
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Contractor:
Galliford Try Construction
End User: Welsh Water
Scheme: Turkey Shore - Holyhead Sewerage Treatment
Works
Product description;
5000 x 4000 (mm), FACTA B, multiple access cover &
frame for a combined pump & valve chamber, various man
access points with 'Torsion Spring Assisted Lift' & hinged
safety grids, all covers are double sealed, multiple beam
support system & bolt on wall pockets. Installation guide
provided. |
|
| Contractor: Barhale Construction
End User: Severn Trent Water
Scheme: Bewdley Flood Alleviation
Scheme
Product description; 3000
x 1000 (mm), FACTA D, three part double seal access
cover and frame, each cover hinged with 'Torsion Spring Assisted
Lift' & hinged safety grids, recessed security hasp and
staple locking boxes, collapsible safety fence to protect
against 17m drop. Installation guide provided. |
|
 |
 |
 |
 |
 |
 |
 |
Contractor: M W H Constructors
End User: Yorkshire Water
Scheme: Pottery Lane CSO
Description; 11500 x 3000 (mm), FACTA B, double seal access cover and frame, with several 'Torsion Spring Assisted' man access points with hinged safety grids, recessed hasp and staple security boxes, other drop in covers c/w threaded eyes for mechanical lift out, multiple beam support system with bolt on wall pockets. Installation guide provided. |
|
 |
 |
 |
 |
 |
 |
|