Home
My Wrekin
Understand the link between poor ironwork installations and pothole creation in our new whitepaper. Potholes - More than a surface issue Get your copy

Load classifications

C250 solutions

C250 manhole cover and gully grating capable of withstanding a 25-tonne test load. For installation no more than 500mm from the kerb face into the carriageway.

SafeSeal C250 manhole cover
Contact us form filling

Contact us

Whether you are looking for live project support, or are in the initial stages of specification, we are always on hand and happy to help.

Related case studies

Related case study

M25 hard shoulder improvements

Mouchel were contacted by the Highways Agency (HA) and tasked with investigating the most cost effective and reliable way to utilise the hard shoulder of the M25 during peak rush hours. This posed several engineering problems, of which one was to consider the service life of the manhole covers that would now be located in the wheel track of one of Europe’s busiest stretches of motorway.

Mouchel
Mouchel
Read more
Related case study

Accelerating town centre regeneration in Dudley

Knowing that there is always a solution waiting to be discovered, our bespoke steel team has helped Dudley Metropolitan Borough Council settle on a high quality specification to meet its needs.

Dudley Metropolitan Borough Council
Dudley Metropolitan Borough Council
Read more