Home
My Wrekin
CD 534: Chamber Tops and Gully Tops for Road Drainage and Services, now at version 0.2.0. is here Find out more

Load classifications

C250 solutions

C250 manhole cover and gully grating capable of withstanding a 25-tonne test load. For installation no more than 500mm from the kerb face into the carriageway.

SafeSeal C250 manhole cover
Contact us form filling

Contact us

Whether you are looking for live project support, or are in the initial stages of specification, we are always on hand and happy to help.

Related case studies

Related case study

Aberdeen Western Peripheral Route (AWPR)

The Aberdeen Western Peripheral Route (AWPR) will provide a new strategic road link to improve travel in and around Aberdeen and the north east of Scotland. It will take through traffic out of the “Granite City”. Linking Stonehaven at its southern end with Tipperty at the north, the bypass had been built by the Connect Roads consortium, consisting of Balfour Beatty, Carillion and Galliford Try (Morrison Construction).

Transport Scotland /Aberdeen City and Aberdeenshire Councils
Read more
Related case study

Partnering with Thames Water for Unmatched Longevity

Our 18-year partnership with Thames Water showcases how collaboration and innovation deliver lasting results. By replacing failing manhole covers with our high-performance Unite™ range, we provided a durable solution proven to withstand London’s toughest routes. With over 100,000 units installed and zero recorded failures, Unite™ has eliminated common ironwork failure mechanisms.

Thames Water
Read more