Home
My Wrekin
Understand the link between poor ironwork installations and pothole creation in our new whitepaper. Potholes - More than a surface issue Get your copy

Load classifications

C250 solutions

C250 manhole cover and gully grating capable of withstanding a 25-tonne test load. For installation no more than 500mm from the kerb face into the carriageway.

SafeSeal C250 manhole cover
Contact us form filling

Contact us

Whether you are looking for live project support, or are in the initial stages of specification, we are always on hand and happy to help.

Related case studies

Related case study

M60 - M62 Smart Motorway

The M60 – M62 smart motorway forms an important part of the main east-west transport corridor, linking Merseyside and Greater Manchester with Yorkshire and the Humber. Wrekin Products worked closely with Manchester Smart Motorway JV, offering technical advice and adapting the specification of the product to ensure it would provide the optimum solution. 
Manchester Smart Motorway JV
Read more
Related case study

Improving Reliability with Dudley Metropolitan Borough Council

Dudley Metropolitan Borough Council is responsible for maintaining and improving Dudley’s roads and highways, which consist of a network of some 600 miles of both major and minor roads. Wrekin's Unite range and Unipak mortar were used in the improvement of the quality of roads around the Dudley area.

Dudley Metropolitan Borough Council
Dudley Metropolitan Borough Council
Read more