Home
My Wrekin
transparent

BT Openreach Portal

Introducing the new Openreach compliant frames and covers.

Backed by extensive research, real-world trials and live network validation, our newly designed CW1-CW4 covers are now ready to roll out across the UK.

Built for performance. Designed for confidence. Delivered with the reassurance only Wrekin can provide.

A new standard in access solutions for the telecoms network

A SEAMLESS UPGRADE

Our CW1-CW4 manhole covers and frames have been developed specifically to meet the latest BT Openreach carriageway specification. But we’ve gone far beyond just ticking compliance boxes.

This new generation of BT Openreach compliant covers introduces a range of improvements designed to make your life easier on site, without altering the way you install and provide much longer installation performance.

Key upgrades include

  • Stronger bedding support for improved load transfer and reduced stress on bedding materials.
  • Enhanced seating design for longer life and reduced wear.
  • Smarter locking system, with housing contained within the frame, reducing risk of damage during installation.
  • Improved alignment for a better fit and consistent performance under load.
BT compliance icons

 

REVOLUTIONARY INBOARD LOCKING SYSTEM

Inboard locking function on a BT access cover

The newly developed inboard locking mechanism allows for a more streamlined installation process while significantly reducing the risk of damage during reinstatement. The system keeps the locking components safely inside the cover's profile, eliminating interference with compaction equipment during tarmac finishing.

Still the same where it matters most

All the critical features and dimensions you rely on remain the same, so you can install with confidence, using the same methods, tools and equipment as before.

Here's what remains the same

Installation tools: Fully compatible with existing BT Openreach cover lifters and fitting gear (LN373 Clause 5 compliant).

Bedding materials: Designed to work seamlessly with approved mortars - no change to bedding depths, preparation or curing processes.

Installation methods: Follows the same LN550 procedures and inspection criteria already familiar to your teams.

Your contacts

 

Name Responsibility Phone number Email
Paul Thompson Technical specification management 07960 050 212
Dave Sanders Framework management 07794 655 531
Ian Wardropper Framework management 07703 824559
Pete West Framework management 07974 007756
Molly Perrin Ordering and administration 01543 440485

As a trusted supplier to the UK utility and highways market, we use our in-depth knowledge to design solutions that make every day better.

Our new BT Openreach range delivers real improvements in performance, sustainability and whole-life value. Helping you get the job done right, first time.

Engineered for performance

  • Reduction in bedding stress thanks to optimised frame design and increased surface contact​.
  • Designed and independently tested to withstand heavy, repetitive loading in carriageway conditions.
  • Structural performance validated against the latest BT Openreach fatigue and endurance criteria.

Smarter for sustainability

  • Designed to deliver lower whole-life carbon. Helping BT Openreach and its contractors hit decarbonisation targets without compromising reliability.
  • Improved seating position increases the distance from the chamber edge improving installation logevity and protecting the chamber from costly damage.

Built for operational safety

  • Inboard locking design offers secure access while minimising risks of damage during installation.
  • Easy-clean seating interface to reduce maintenance downtime.
  • Simpler to maintain.
Contact us form filling

Contact us

Whether you are looking for live project support, or are in the initial stages of specification, we are always on hand and happy to help.