Step 1

If replacing an existing cover, ensure that there is sufficient depth to accommodate the new frame plus 20-40 mm of bedding mortar. If necessary, remove material from the top of the chamber to achieve this, taking care to avoid debris entering the chamber.

Recessed covers in paving - Image 1

Step 2

Remove the cover from the frame using a set of heavy-duty lifting keys. For locked covers first remove the retaining bolts and set aside for later use.

Refer to page 2 of the Wrekin Specification sheet for details of locking and lifting options and removal equipment.

Recessed covers in paving - Image 2

Step 3

Position the frame over the manhole chamber, ensuring that the frame is large enough and can be positioned in such a way that no part of the frame overhangs the opening. Note that overhanging, unsupported framework can cause premature cover failure.

Recessed covers in paving - Image 3

Step 4

Roughly mark out an area large enough to accept the frame. Clear away any loose or flaky material within this area to leave a sound surface for the new mortar bed.

The level of the frame can be set with a straight edge from a nearby finish if available or by string lines set to finish level, temporarily shim the frame to judge the depth of the mortar bed.

Recessed covers in paving - Image 4

Step 5

Lay down a mortar bed large enough to fully support the frame, leaving it proud enough for tamping.

Step 6

Position the frame on the mortar bed in its previously established location and carefully insert the cover. If the cover is to be locked the previously removed bolts should now be inserted, do not fully tighten them at this stage.

Tamp down until the top of the cover and frame sits 2 to 3 mm below the finish floor line on all sides.

Check that the cover sits in the frame without rocking and that the top of the cover and frame is level, making any necessary adjustments to achieve a good fit.

Recessed covers in paving - Image 5

Step 7

Point the inside of the frame and remove any excess mortar. Haunch around the outside of the frame and over the fixing lugs, allowing enough free frame depth to accept the paving.

Recessed covers in paving - Image 6

Step 9

Insert plastic spacers between the cover and frame to ensure even gaps on all four sides and prevent distortion whilst paving.

Recessed covers in paving - Image 7

Step 10

Continue paving around the frame, cutting blocks as required to sit against the frame side, do not force blocks as this will distort the frame and make cover removal difficult.

Recessed covers in paving - Image 8

Step 11

Lay the paving in the cover on a 20 mm to 30 mm bed, this can be sharp sand, or for areas more frequently accessed or subject to heavier loadings a screed / mortar bed is recommended.

Gaps between the blocks must be fully filled with a proprietary grout to prevent movement.

Note: Unbound permeable paving grit does not provide a stable bed or fill between blocks within a steel cover and should not be used.

Recessed covers in paving - Image 9

Related pages

Related products

Stock code Clear opening
(mm)
Overall top of frame
(mm)
Frame depth
(mm)
Load duty My Wrekin
C271M/030030 300 x 300 385 x 385 58 Light / medium duty
C271M/030030/SQR 300 ⌀ 385 x 385 58 Light / medium duty
C271M/045045 450 x 450 535 x 535 58 Light / medium duty
C271M/045045/SQR 450 ⌀ 535 x 535 58 Light / medium duty
C271M/060045 600 x 450 685 x 535 58 Light / medium duty
C271M/060060 600 x 600 685 x 685 58 Light / medium duty
C271M/067067 675 x 675 760 x 760 58 Light / medium duty
C271M/075060 750 x 600 835 x 685 58 Light / medium duty
C271M/075075 750 x 750 835 x 835 58 Light / medium duty
C271M/090060 900 x 600 985 x 685 58 Light / medium duty
C271M/090075 900 x 750 985 x 835 58 Light / medium duty