We were approached by Stow Farm Stud to provide geosynthetic separation and filtration solutions for a high intensity Horse manege.

The scope included the construction of a 60 x 30m manége with a 150mm deep drainage layer and a 150mm deep top dressed equisand surface.

After reviewing the site’s specific ground information we recommended our FasTrack™ 609 woven geotextile for the separation layer of the new clean sub base and the existing sub grade. FasTrack™ 609 is designed and manufactured to conform to the Department of Transport and Highways specification for road and earth works separation.

The geotextile recommended between the sub base and the new top equisand surface was our MultiTrack™ SNW80 non woven geotextile, which provides unrivalled puncture resistance, tensile strength and permeability. The SNW range of non woven geotextiles are ideal for the upper layer of geotextile reinforcement for horse maneges and other sports surfacing.

Stow Farm installation in progress

Stow Farm horse manege

Wrekin’s technical support and product design was critical to the implementation of the geotextiles. The manege is now operating very well and we are pleased with the final result.

Ian Slaughter

Crown Estate Management

Related case studies

Related case study

Earl Shilton Treatment Works

​​​​​​Wrekin Products was approached by Severn Trent’s contractor to discuss the creation of site access and a proposed working platform to be installed at the sewage treatment works at Earl Shilton, south west of Leicester. The proposed plant for the site works required temporary works access as well as a working platform for the concrete pump and hydraulic (Kobelco CKE700) crawler crane.

Severn Trent
Severn Trent
Read more
Case study

Great Yarmouth Outer Harbour

When Peel Ports Great Yarmouth was selected to be the base for the construction and installation activities for the Galloper and East Anglia ONE wind farms in the Southern North Sea. A significant part of the works required was to create a 100,000m2 yard storage and marshalling area for the components of the wind turbines before they are shipped out to the wind farm sites.

Peel Ports
Peel Ports
Read more