Piling platforms are essential for carrying heavy tracked plant, such as piling rigs and cranes. These vital, temporary measures must deliver safety while being as time and cost effective as possible.

Piling mat
Working platforms and compounds

Keeping costs under control

Accelerating your construction programme

One of our value engineering solutions to solve these problems is geogrids – an under-utilised solution, which can reduce the thickness of a working platform, typically by 50 per cent, resulting in substantially reduced construction cost and time.

Along with significant cost reductions, geogrids improve site health and safety, accelerate construction timescales and reduce the project’s overall environmental impact.

This is because when granular particles are compacted over these grids, they partially penetrate and project through the apertures to create a stiff and positive interlock. The load dispersal effect from the interlocking mechanism increases shearing resistance within the aggregates, improving compaction and allowing the granular thickness to be decreased – ultimately reducing construction time and cost.

Intelligent adoption of geogrid

The intelligent adoption of geogrids offers two key benefits:

  • Significant upfront savings during construction works
  • Further cost reductions when at the end of the programme

The positive effects are then felt across the supply chain. House builders, for example, are facing huge demands to construct additional housing but also need to tackle challenges such as improving build times while minimising overheads. This is where we can prove invaluable, helping house builders to find additional time in the build programme – and before the first on-site construction even begins. Recycled aggregates can be used to further reduce costs and site CO2 emissions.

Working platforms in numbers

Wrekin geosynthetic solutions have been used on thousands of projects to provide significant costs savings as well as promote sustainability and reduce emissions.

reduction available on the thickness of a working platform.

50%

cost reductions available when using Wrekin Geogrid.

40%

MultiTrack supplied in the last 5 years.

>50million m²

Ready to get invovled

Supporting tender bids

We’re an advocate of early engagement because if a Wrekin engineering manager is engaged at the tender stage, the impact on the savings to reduce time and money can also assist contractors in winning tenders.

Another benefit of early engagement is that geogrids can be manufactured to the exact width that the contractor needs, suiting the site-specific requirements and creating an even more cost-effective grid. Simply removing a longitudinal overlap in the geogrid layout can save a further 10 per cent in product costs alone. Small changes but big savings are available.

Tender bids
Working side by side

A supportive team

We have developed a strong reputation in the civil engineering services sector thanks to our skilled teams wealth of experience. We offer the best technical expertise with exceptional customer support. Our team works with asset owners, developers, main contractors, ground workers and local authorities throughout a construction scheme’s lifecycle, including:

Initial project support

Listening and working with customers to fully understand their requirements. We provide pre-tender and tender support to lend a competitive edge.

Product specification

Our technical experts and value engineering service means that you have access to the best advice and support.

Design schemes

Our talented team provides full design services, with the added bonus of supporting documentation and drawings.

Advice and site meetings

We understand the value of regular site meetings, helping to improve communication, giving installation advice and ensuring each project is completed successfully, right down to the project review

Severn Trent Earl Shilton
Success Stories

Generating significant savings during temporary works

Our technical team worked in partnership with Severn Trent Water’s contractors to create a temporary working platform at sewage treatment works at Earl Shilton, south west of Leicester, using a high-performance E’GRID geogrid.

Throughout the project, we supported the coordination of the proposals and collaborated with the full supply chain, the scheme designers, and Tier 1 contractor Stantec.

Contact us

Contact us

Whether you are looking for live project support, or are in the initial stages of specification, we are always on hand and happy to help.

Related case studies

Related case study

Great Yarmouth Outer Harbour

When Peel Ports Great Yarmouth was selected to be the base for the construction and installation activities for the Galloper and East Anglia ONE wind farms in the Southern North Sea. A significant part of the works required was to create a 100,000m2 yard storage and marshalling area for the components of the wind turbines before they are shipped out to the wind farm sites.

Peel Ports
Peel Ports
Read more
Related case study

Earl Shilton Treatment Works

​​​​​​Wrekin Products was approached by Severn Trent’s contractor to discuss the creation of site access and a proposed working platform to be installed at the sewage treatment works at Earl Shilton, south west of Leicester. The proposed plant for the site works required temporary works access as well as a working platform for the concrete pump and hydraulic (Kobelco CKE700) crawler crane.

Severn Trent
Severn Trent
Read more