Home
My Wrekin

Saving time, money and worry on steelwork in Hatfield

Accelerating town centre regeneration in Dudley

Glasgow Airport Investment Area

16 years later, our Piccadilly Circus story goes on

Essex highways: A solution to gully grate theft

Herring Bridge: End-to-end bespoke steel installation

The steel of Nottingham Castle

Years of exceptional performance

Clicklift saves housing development time and money

First ever commemorative LGBTQ+ manhole cover takes pride of place

M60 - M62 Smart Motorway

Bespoke access covers for the River of Light

Lord's Cricket Ground

Scotland’s first ever ClickLift installations

M25 hard shoulder improvements

Ensuring a smooth commute between Northern Ireland’s biggest cities

Junction 9 improvements for the M27

Aberdeen Western Peripheral Route (AWPR)

Improving Reliability with Dudley Metropolitan Borough Council

Unite(d) at Sunderland City Council

Solving Virgin Medias Failing Manhole Cover Issue

Case study

Saving time, money and worry on steelwork in Hatfield

After assessing a problematic job raising questions in Hatfield, our bespoke steel team rescued an opening by providing the end-to-end steel service needed.

Associated Asphalt
Associated Asphalt
Read more
Case study

Accelerating town centre regeneration in Dudley

Knowing that there is always a solution waiting to be discovered, our bespoke steel team has helped Dudley Metropolitan Borough Council settle on a high quality specification to meet its needs.

Dudley Metropolitan Borough Council
Dudley Metropolitan Borough Council
Read more
Case study

Glasgow Airport Investment Area

Up against time and cost to deliver, contractor Wills Bros needed suppliers they could trust to meet the mark on the Glasgow Airport Investment Area (GAIA) project.

Wills Bros.
Wills Bros.
Read more
Case study

16 years later, our Piccadilly Circus story goes on

Piccadilly Circus is one of the busiest road junctions in Europe and an iconic part of London’s West End – what you may not know however is that it is also home to one of our original Unite access covers.

Thames Water
Thames Water
Read more
Case study

Essex highways: A solution to gully grate theft

The need to rapidly replace dozens of gully grates which were stolen in the Uttlesford area of Essex over a three-day period was met by Wrekin Products’ MultiGrate, a composite grating which can be sized on site to replace almost any missing gully ironwork and provide an instant temporary fix.

Ringway Jacobs
Ringway Jacobs
Read more
Case study

Herring Bridge: End-to-end bespoke steel installation

Norfolk County Council’s third river crossing project in Great Yarmouth is one of the area’s most significant infrastructure projects in years. A significant part of the project involves an extensive upgrade to Norfolk’s road network, linking the two sides of the river and making use of a five-exit roundabout to take on the bulk of the town’s heavy traffic congestion.

BAM Farrans JV
BAM Farrans JV
Read more
Related case study

The steel of Nottingham Castle

Nottingham Castle, a historically significant landmark in the city centre, underwent a three-year, £33m regeneration with the aim of becoming one of the country’s best attractions.

Nottingham City Council
Nottingham City Council
Read more
Related case study

Years of exceptional performance

Our Highway D400 covers are still operating at full capacity after three and a half years of being subjected to high levels of HGV traffic. Meaning the organisation can focus solely on new work, rather than being distracted by manhole covers that have failed prematurely and need fixing or, in some cases, reinstalling.

Scottish Water
Scottish Water
Read more