Home
My Wrekin

Supporting the Scottish National Gallery Revamp

Years of exceptional performance

ClickLift saves housing development time and money

Longhill burn Wind Farm

First ever commemorative LGBTQ+ manhole cover takes pride of place

Ground stabilisation for Code Fitness Gym

Helping to keep busy Suffolk road moving

M60 - M62 Smart Motorway

Value Engineed Road for Oak Grange housing development

Hinkley Point C Nuclear Power Station haul road

Bespoke access covers for the River of Light

Lord's Cricket Ground

Scotland’s first ever ClickLift installations

M25 hard shoulder improvements

Ensuring a smooth commute between Northern Ireland’s biggest cities

Junction 9 improvements for the M27

Whittington Rifle Ranges

Ornamental Pond at Fallow Park

Old Colwyn Embankment Repairs

Earl Shilton Treatment Works

Aberdeen Western Peripheral Route (AWPR)

Improving Reliability with Dudley Metropolitan Borough Council

Colchester Cemetery and Crematorium

Unite Installation Sunderland

Warner Brothers Studio

The Kinema in the Woods

Cumnock SWS Power Line Upgrade

Belton House Overspill Car Park

Thetford Woodland Lodges

Chelsea Garden Project

Solving Virgin Medias Failing Manhole Cover Issue

Bristol Airport, Silverzone Car Park

Great Yarmouth Outer Harbour

Helping Alan Titchmarsh to ‘Love Your Garden’

Mostyn Sea Wall Repairs

Case study

M60 - M62 Smart Motorway

The M60 – M62 smart motorway forms an important part of the main east-west transport corridor, linking Merseyside and Greater Manchester with Yorkshire and the Humber. Wrekin Products worked closely with Manchester Smart Motorway JV, offering technical advice and adapting the specification of the product to ensure it would provide the optimum solution. 
Manchester Smart Motorway JV
Read the full Case Study
Related case study

Value Engineed Road for Oak Grange housing development

The Wrekin Products geogrids team value-engineered a fit-for-purpose adoptable road for a new Derby housing development, working with the city council, William Davis Homes and S&L Groundworks. This project demonstrates how value engineering solutions such as geogrids can be used to solve general and site-specific issues for the housing sector.

William Davis Homes
William Davis Homes
Read the full Case Study
Related case study

Hinkley Point C Nuclear Power Station haul road

Working with J. Murphy & Sons and Balfour Beatty we helped with the construction of a ten-kilometre haul road to support the first UK nuclear power station to be built in over 20 years. When complete, Hinkley Point C in Somerset will provide low carbon electricity for around six million homes across the South West.

EDF Energy
EDF Energy
Read the full Case Study
Related case study

Bespoke access covers for the River of Light

Specialist steel access covers required as part of the artistic transformation of a city centre street in St Helier, Jersey have been designed and manufactured by civil engineering specialist Wrekin Products.  One of the highlights of the regeneration project is the Pitt Street art installation, ‘The River of Light’, funded by the Channel Islands Co-operative Society.
Channel Islands Co-operative Society
Channel Islands Co-operative Society
Read the full Case Study
Related case study

Lord's Cricket Ground

Wrekin Products were approached by consultant Buro Happold to discuss the redevelopment of the Compton and Edrich Stands at Lords Cricket Ground, St John Wood, London.  The redevelopment proposed, required two bespoke covers that could interact with pre-existing valves and hydrants below. Both covers would need to satisfy Thames Water and Fire Brigade specifications.
Lords Cricket Ground
Lords Cricket Ground
Read the full Case Study
Related case study

Scotland’s first ever ClickLift installations

Wrekin has successfully completed five ClickLift™ installations as part of trials for two separate housing developments in Scotland, marking the first time the product has been used outside England. ClickLift™ raises Wrekin Highway and TriStar frames to suit the final surface layer without the need for digging out and re-installing.

Campion Homes, Tough Construction, Dawn Homes
Campion Homes, Tough Construction, Dawn Homes
Read the full Case Study
Related case study

M25 hard shoulder improvements

Mouchel were contacted by the Highways Agency (HA) and tasked with investigating the most cost effective and reliable way to utilise the hard shoulder of the M25 during peak rush hours. This posed several engineering problems, of which one was to consider the service life of the manhole covers that would now be located in the wheel track of one of Europe’s busiest stretches of motorway.

Mouchel
Mouchel
Read the full Case Study
Related case study

Ensuring a smooth commute between Northern Ireland’s biggest cities

The Department for Infrastructure in Northern Ireland committed to funding a £185m ‘flagship’ infrastructure project to upgrade the A6, with the aim of reducing congestion and improving road safety. Richard Stewart, Regional Director ‑ UK North & Ireland at Wrekin Products, explains how a combination of excellent service and just in time deliveries secured an exciting opportunity to supply Highway® manhole covers and gully grates to such a significant project.

Department for Infrastructure Graham Construction Farrans
Department for Infrastructure Graham Construction Farrans
Read the full Case Study